Push the pipe cap onto the pipe until its edge reaches the depth mark.
Capping off toilet waste pipe.
Sink disconnect pipes place end caps to water pipes disconnect out let pipe cut of to desired place cap of pipe.
You could also probably chip it out with a knife sharp chisel.
If the floor flange for the toilet is set in concrete the job will be a lot more difficult than if it s on the second floor for example and the flooring can be removed to permanently close off the pipe.
To permanently close off the pipe in a concrete slab the floor flange should be removed and the pipe capped below the floor surface.
Cap the pipes.
Many of today s drainpipes are pvc.
This will involve removing a portion of the surrounding concrete removing the floor flange which may have to be cut out and then the capping the pipe.
Unscrew sink lift away.
Turn off the feed valve drain the water from the tank unhook the feed line and remove the anchoring bolts with a wrench.
End cap for main drain out let.
Pull the toilet up and out of the way.
Capping them requires the use of a pvc cleaner and a pvc glue to hold the new cap securely.
Get a cleanout or expandable test plug that fits.
Sink 50mm 2 inch cap.
Slice off a bit of the top of the pipe embedded in the floor.
If the top of the plug still sticks out above the floor you can get an internal pvc pipe cutter which is like a rotary dremel circular saw blade on a drill shaft.
Water pipe 1pm caps.
The mark will tell you when the fitting is pushed on all the way which is essential for a proper seal.